Heard Concrete was contracted by W. F. Magann to install the new dry dock floor including new trench drains and caisson seats. We assisted in the drilling and installation of thousands of dowels grouted into the existing base concrete. Next, over 5,000cy of heavy-duty reinforced concrete paving was installed in checkerboard patterns along with new trench drain walls. The caisson seats provided a challenge as setting large heavy stainless-steel plates had very tight tolerances. We also installed a raised electrical platform on pile supports and a large cast in place electrical vault.
To say the least, this was a very aggressive schedule as submarines were scheduled for re-fueling and time was of the essence to finish on time.
Working with W.F. Magann and their team of professionals was truly enjoyable, we always felt like part of their team and look forward to working with them soon.
Project Information:
Architect: Naval Facilities Engineering Command
Final Cost:
Project Manager: Andy Williams
Superintendent: Danny Nero, Butch Reinert, Josh Johnson
Prime Contractor: W.F. Magann Corporation
Project Start: 2021
Project Completion: 2022
Challenges: Site logistics, fast-paced schedule