Tactical Equipment Maintenance Facility – Fort Eustis, Newport News, Virginia
This project consisted of 49,000sf of concrete paving. The concrete was 11” thick installed in two placements over a recycled concrete base. Heard Concrete installed dowels, dowel baskets and performed initial saw cutting 10’o.c. in each direction. Concrete was delivered in ready mix trucks and installed at a 2% slope using our Somero laser screed. The average placement was over 800 yards approximately 45’ wide.
Project Information:
Architect: Baskervill.
Civil Engineer: CHA INC.
Final Cost: $719,354.00
Project Manager: Jack Ellenor
Superintendent: Rodger Gregory
Prime Contractor: Curtis Contracting
Project Completion: 2010